Dhaka Mass Transit Company Limited (DMTCL) Managing Director Md. Faruk Ahmed confirmed that no physical displacement occurred in Dhaka’s metro rail infrastructure following the recent earthquake. Speaking at a press conference in Uttara on December 1, he said that passenger safety remains the top priority and that operations were temporarily halted for thorough inspections. Engineers physically examined all metro structures for four to five hours after the tremor, including bearing pads at Farmgate and Bijoy Sarani. Two test runs were conducted before resuming public service, causing a 27-minute delay. Ahmed also addressed misinformation circulating on social media, dismissing claims that metro structures had collapsed. He clarified that only minor cracks appeared on a wall, two tiles fell, and a few ceiling pads loosened, none of which indicated structural damage. The DMTCL reassured commuters that the metro system remains safe and fully operational.