A two-lane road in Nalitabari, Sherpur, remains unrepaired four months after being severely damaged by a flash flood. The road closure has caused immense suffering for commuters, forcing them to pay higher transportation fares. The devastating flood on October 5 left the road in such poor condition that locals had to construct a makeshift bamboo bridge. Shariful Islam, Executive Engineer of the Sherpur Roads and Highways Department, stated that higher authorities have been informed and multiple inspections have been conducted. Plans to build a culvert have been finalized, and reconstruction work will begin once the tender is approved.